PlantBench / Robotics and automation ROI calculator
Robotics and automation ROI calculator
A worksheet for a cell, a pick-and-place, or a wider automation project. Labor is usually the largest term. The defaults are not a vendor quote.
Labor is the case
A cell earns its keep when people come off the step: packing, tray loading, case forming, palletizing, or a repetitive transfer. The default is a 45% cut on a modest crew. That is only honest if those hours actually leave the schedule. If the robot adds an attendant and removes nobody, set the labor reduction to zero and read the sheet again.
Person-hours are the whole crew on the step, not the robot’s nameplate. Four people for eight hours is 32. Two people is 16.
Yield and quality depend on the job
Some cells drop fewer pieces, bruise less, or hold a spec that hand work misses. Some do none of that. The default is one yield point, and it is a placeholder. If you cannot name the pounds you would stop losing, set the points to zero. A better grade on the same pounds belongs in product value, not in both places.
Quality that you cannot price is still a reason to buy. It is not a reason to type a yield number you do not believe. Say it in the meeting.
Energy is usually the small term
Servos, vision, and compressed air show up as kilowatt-hours, and they are often modest next to the labor dollars. The default steps electricity up a little and leaves gas at zero. If the project is a new compressor or a cold-room door that will cycle all night, put that load in the kWh fields or in capital. Do not assume energy is free, and do not let a small electric line hide a weak labor story.
Capital and the calendar
The default capital is a placeholder for one cell, not a fleet and not the conveyors, guarding, and integration around it. If integration is part of this decision, it belongs in the capital field. A seasonal line that runs 30 to 40 weeks should not sit on a year-round calendar. Use the weeks toggle, then edit it to the weeks the cell is staffed.
This page is the same math as the washer, the sorter, and the full line. It is an estimate for a capex conversation. It is not a design, a quote, or a guarantee, and it is independent of any single OEM.